Kings Cross Remodelling Project
Helping transform travel to and from the London on the East Coast Main Line
A major part of the East Coast Upgrade by Network Rail was a multi-million-pound investment in renewing track, signalling and overhead line equipment at King’s Cross. As part of the signalling renewals and upgrades, B&F were contacted to supply various signalling power control equipment and supporting services to ensure continuity across the project; this included:
- Kings Cross PSP – Non Containerised PSP to be installed in Brick Built Building
- Holloway ASP including Switchboard, Transformer and GRP Container and additional Site Work
- Hornsey Double Sided DNO Cubicle
Industry
Products used
Principal Supply Point, Auxiliary Supply Point & DNO Cubicle
Location
London, UK
Client
Railway Electrical Services