B&F Expand Rail Capabilities to Subways

Baldwin & Francis have further extended their rail capabilities in a recent project for a major subway system in the UK.

The subway, which carries millions of passengers each year, is one of the oldest subway systems in the world. This brownfield project would see a complete transformation including the provision of a brand-new Integrated System with new Rolling Stock, Depot Equipment, Construction Works and Fixed Equipment.

place holder

Industry

Rail & Transport

Location

UK

lee avatar

Talk to a specialist about this project

The Project

The subway, which carries millions of passengers each year, is one of the oldest subway systems in the world. This brownfield project would see a complete transformation including the provision of a brand-new Integrated System with new Rolling Stock, Depot Equipment, Construction Works and Fixed Equipment.
As well as the new trains, the Subway’s signalling equipment, control systems and control centre were all to replaced and improved – this is where Baldwin & Francis rose to the challenge.
Working alongside a mixture of contractors, B&F were tasked to supply:
Distribution Power Supply unit (PSU) sub-system which comprised of the Operations Control Centre (OCC) and the 15 Station Equipment Rooms (SER) with the following associated equipment:

  • 15 off Signalling Equipment Room (SER) comprising of:
    • 1kV RMU.
    • 400V switchboard panel.
    • 48VDC PSU cabinet.
    • 400V Uninterruptable Power Supply (UPS)
  • 1 off Operations Control Centre (OCC)
    • 6.6kV/11kV transformer feeder panel.
    • 400V Non-Maintained switchboard panel.
    • 400V ATS Changeover panel.
    • 400V maintained switchboard panel
    • 400V essential panel board panel.
    • 24V DC PSU cabinet.
    • 48V/50V DC PSU cabinet.
    • 1kV RMU.

Despite B&Fs extensive experience with the likes of Network Rail etc. this was a completely new concept with associated risks including:

  • Detailed design work
  • The design and manufacture of a brand-new concept; never previously produced by B&F
  • The provision of necessary facilities such as an adequate test facility for product validation.
  • Short lead times

However, working collectively as a team and utilising years of expertise and knowledge; a concept was created, engineered and successfully manufactured at B&F Headquarters in Sheffield with installation and commissioning on site set to take place throughout 2020.

Get in touch

To find out how well we can meet your needs, call our support team on +44 (0)114 286 6000.

How we work

Accreditations & memberships

Ready to get started?
Talk to us today

The B&F Team has experience across all our sectors and many electrical installations. Get in touch with one of the team to see how B&F can assist you with your project requirements.